Jiangsu Longcheng Casting Machine Co., Ltd.

Quality is our culture.

Manufacturer from China
Active Member
8 Years
Home / Products / Blast Cleaning Machine /

Roller Conveying Blast Cleaning Machine Automatic Steel Shot Peening High Speed

Contact Now
Jiangsu Longcheng Casting Machine Co., Ltd.
Province/State:jiangsu
Country/Region:china
Contact Now

Roller Conveying Blast Cleaning Machine Automatic Steel Shot Peening High Speed

Ask Latest Price
Brand Name :LC
Model Number :Q698, Q6910, Q6918, Q6920
Certification :ISO9001
Place of Origin :Jiangsu, China
MOQ :1 set
Price :Negotiable
Payment Terms :L/C, T/T
Supply Ability :30 sets per month
Delivery Time :Within 30-40 Days After The Deposit
Packaging Details :General Container, Open Top Container, Skeletal Container, Bulk Cargo
Name :Blasting cleaning machine
Cleaning type :Automatic
Cleaning process :Shot blasting, shot peening
Feature :Critical cleaning
Machine material :Metal / coil
Experience :More than 15 years' design experience
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Automatic Roller Conveying Blast Cleaning Machine by Steel Shot Peening

Briet introduction of roller conveyor blast cleaning machine:

Automatic blast cleaning machine is widely used for metal gridding, steel tube, petroleum, chemical, electric power industry. It is a kind of dry cleaning machinery. In the process of forming, processing, transporting and storing of the work piece, there will always be oxide coating, rust, slag, dust, oil and others on the surface. The machine uses high-speed blast to strike and cut the surface of the work piece in dry and non-fluid media, and realize the cleaning purpose.

The features of Q69 series blast cleaning machine:

1. Steel plate, H beam steel structure blast cleaning machine has three kinds of pass through type: Roller conveying pass through, trolley pass through, hanger pass through.

2. They are widely used in the industry of steel structure, engineering machinery, bridge building and so on. By shot blasting, it can remove rust, oxide layers, welding slag and other pollutant and eliminate surface stress force.

3. After shot blasting, it can improve paint film adhesion with steel, improve anti-rust capacity, improve the quality and prolong the service life of steel structure.

4. The steel shots blasted by blasting turbines will be collected, purifying by shots circle system and continue to be used again for blasting turbines.

5. The working process flow of shots circle system: steel shots blasted by blasting turbines will be collected by portrait screw conveyor and delivered to bucket elevator then the bucket elevator will lift to air wash type separator.

6. After separating, the dust and broken steel shots will be removed away from steel shots and good steel shots will enter storage bin.

Detailed technical information:

Parameter Q698 Q6912 Q6915 Q6920 Q6925 Q6930 Q6940
The effective cleaning width (mm) 800 1200 1500 2000 2500 3000 4000
The entrance size(mm) 1000*400 1400*400 1700*400 2200*400 2700*800 3200*800 4200*400
The length of cleaning workpiece (mm) 1200-12000 1200-1600 1200-12000 1200-12000 3000-12000 2400-12000 4500-18000
The speed of conveyor (m/min) 0.5-4 0.5-4 0.5-4 0.5-4 0.5-4 0.5-4 0.5-4

The thickness of cleaning

steel sheet (mm)

3-60 3-60 1.5-60 3-60 3-60 3-110 4.5-100
The section steel specification(mm) 800*300 1000*300 1500*300 2000*300 2500*700 3000*700 4000*300
The quantity of shot blasting(kg/min) 4*180 4*250 4*250 6*250 6*250 6*360 8*360
The first enclosed quantity(kg) 4000 4000 4000 4500 4500 8000 11000
Roll brush adjusting height(mm) 200 200 350 450 600 850 900
Total power (kw) 90 78.3 113.5 156.6 204.8 224.55 293.6
Air capacity(m3/h) 22000 17560 19000 19550 27758 28050 38000

Our Services:

1. Installation and commissioning issue:

We will send 1-2 technicians to assist with machine installation and commissioning,

customer pays for their tickets, hotel and diet, etc Customer need arrange

3-4 skilled worker and prepare insallation machinery and tools.

2. Warranty time:

12 months from date of commissioning completion, but no more than 18 months from date of delivery.

3. Supply full English documents:

Including foundation drawings, manual book, electric wiring diagram, electric manual book and maintenance book,etc.

1. what kind of workpiece will you clean?
2. The workpiece size, length, width and height of maximum workpiece?
3. How many workpieces do you want to clean per day?

Inquiry Cart 0